Bathroom renovation checklist: the decisions to make first

Bathroom with two dark blue vanity units, white countertops and basins, round wood-framed mirrors, wall lights and tiled flooring.

Reference plate — twin vanities, wall lighting, tiled floor

Most renovation stress comes from decisions left until the room is already stripped. This checklist puts seven of them in the order they are best settled, before a quote is finalised and long before the first tile comes off the wall.

Scope — seven decisions

01 Budget range · 02 Layout · 03 Schedule of finishes

04 Lead times · 05 Access · 06 Temporary bathroom

07 Approvals

Settle the plan before anyone prices it

A quote is only as accurate as the brief behind it. The first three decisions shape almost every line of a price, so they belong on paper before you ask for one. If they feel hard to pin down, that is exactly what bathroom design and planning is for.

01

A budget range, not a single number

Set a comfortable figure and a ceiling, then keep a margin for what sits behind old wall sheeting. A range lets you decide early where to spend, such as tapware, and where to save. Our cost guide explains what moves the price.

02

The layout, and whether plumbing moves

Keeping the shower, toilet and vanity where they are is usually simpler than relocating waste points. Decide early whether a bath stays, whether the shower becomes step-free and where the door swings. Compare options in bathroom layouts.

03

A written schedule of fixtures and finishes

List every selection in one place: floor and wall tile, grout colour, vanity, basin, tapware, shower screen, toilet, mirror, lighting and accessories. A schedule stops “we’ll pick that later” from turning into a delay mid-job.

Then prepare the house for the work

04

Lead times for every selection

Custom vanities, imported tiles and made-to-measure glass can take longer to arrive than the room takes to strip. Confirm availability before work starts, and order tile with a little extra from the same batch so shade stays consistent. See choosing bathroom tiles.

05

Access, parking and protection

Think through how materials come in and rubble goes out: the path through hallways, stairs or a shared apartment lift, and where a skip or trailer can sit. Clear the route and plan floor protection before day one.

06

A temporary bathroom plan

If this is the only bathroom in the home, decide where the household will shower while it is out of action: a second toilet, family nearby or a short stay elsewhere. Our timelines guide shows how the stages fit together.

07

Any approvals the work needs

Units and townhouses may need owners corporation consent, and work hours can be set by building rules. Structural changes or moved walls should be checked before design is locked in, not after strip-out.

Gloved worker laying large floor tiles into mortar with tile spacers and levelling clips.

Reference plate — large-format floor tile, levelling clips

Checkpoint A

Before you request a quote

Budget range and ceiling agreed

Layout decided, plumbing moves noted

Photos and rough room measurements ready

Checkpoint B

Before strip-out begins

Schedule of finishes signed off

Long-lead items ordered or confirmed

Access route cleared, temporary bathroom arranged

Building consents in hand

Checkpoint C

Before tiling starts

Niche, tap and shower rose positions marked

Grout colour and tile set-out confirmed

Waterproofing complete — see waterproofing explained

A checklist is a brief waiting to be priced

Once these seven decisions are written down, a quote can reflect the bathroom you actually want. If you are rebuilding the whole room, start with complete bathroom renovations; if the layout is still open, begin with bathroom design. Questions first? Contact us.