Bathroom renovation cost in Melbourne: what actually drives the price

Two bathrooms of the same size can end up with very different quotes. The difference is rarely the tile you fell in love with. It is the set of decisions underneath it: whether the plumbing moves, what the waterproofing has to cover, and what is waiting behind the old wall sheeting. This guide walks through those decisions in order, so you can shape a realistic budget before asking for a price.

Bathroom vanity with a white vessel basin, chrome faucet, illuminated oval mirror, pale stone-look wall tiles and dark wood cabinetry.

Reference plate — fixtures and finishes: vessel basin, lit oval mirror, dark timber vanity

Scope of this guide

ASix cost drivers, in order

BFixed by the room vs chosen by you

CWhat strip-out can reveal

DScoping a budget

Six things that set the price

Read these in sequence. Each one tends to affect the ones after it, which is why a bathroom is best priced from a written schedule rather than a showroom visit.

01

Size of the room

More floor and wall area means more membrane, more tile and more labour to set it out. A small bathroom is not automatically cheap, though: tight rooms often need careful detailing and compact fixtures to work well.

02

Layout changes and moving plumbing

Keeping the shower, toilet and vanity where the pipes already run is usually the biggest single saving. Relocating a waste or toilet can mean cutting into floors and walls, so decide early whether the new layout is worth it. Our bathroom design stage settles this on paper first.

03

Waterproofing

Membrane work is hidden once tiled, which makes it tempting to value less. It is the part you least want to redo. Floor falls, shower junctions and the extent of the wet area all shape the scope. See bathroom waterproofing.

04

Tile choices

Tile price is only part of it. Large formats need flatter walls, mosaics and patterns take longer to lay, and full-height tiling multiplies the area. Our guide to choosing bathroom tiles covers the trade-offs.

05

Fixtures and finishes

Tapware, screens, vanities and toilets range widely. Wall-hung items and in-wall cisterns need framing behind the lining, and frameless glass depends on accurate tiling beneath it.

06

Hidden issues found during strip-out

Some costs cannot be seen until the old room is removed. Planning a contingency for them is part of a sensible budget, and is covered further down this page.

Schedule B.1 — the room

Fixed by the room

Floor and wall area to be lined, sealed and tiled

Condition of the floor structure and wall framing

Access to the room and removal of old materials

Existing drainage positions and falls

Schedule B.2 — your selections

Chosen by you

Keeping or changing the layout

Tile format, pattern and tiling height

Bath or walk-in shower, screen type and niches

Vanity, tapware and storage specification

What is fixed by the room is where a quote starts; what you choose is where your budget does its work.

Gloved worker laying large floor tiles into mortar with tile spacers and levelling clips.

Reference plate — floor tile set with spacers and levelling clips

What strip-out can reveal

Many bathrooms in Oakleigh, Hughesdale and Carnegie have been renovated before, sometimes more than once. Once tiles and linings come off, it is common to find a failed membrane, water-damaged framing or flooring, uneven walls that will not suit large tiles, or old pipework that is better replaced while the room is open.

None of this can be priced with certainty from a walkthrough. What you can do is allow a contingency, ask how unexpected work will be discussed before it proceeds, and treat signs like swollen skirting or loose tiles as a hint that the substrate needs attention. If your shower is already leaking, start with leaking shower repairs.

How to scope a budget before you ask for a quote

✓Decide whether the layout stays or changes

✓List must-haves separately from nice-to-haves

✓Choose a tiling height and a tile format range

✓Set aside a contingency for strip-out findings

✓Give a budget range, so options can be matched to it

With those answers written down, a quote becomes a comparison of like with like. For a full strip-out to finish, see complete bathroom renovations; to settle layout and finishes first, see bathroom design. Further reading: renovation checklist, renovation timelines and common renovation mistakes. Questions first? Use our contact page.