Bathroom renovations in Oakleigh, decided detail by detail

Every renovation we plan starts on paper: a written schedule of layout, waterproofing, tiles, tapware and vanity, agreed before anything is removed from the room. You see each decision, and the price, before work begins.

Contemporary bathroom with a timber vanity, white integrated basin, mosaic tile backsplash, large mirror, toilet and orchid plant.

PLATE 01 — TIMBER VANITY WALL, PATTERNED TILE · DESIGN INSPIRATION

Why choose us: a schedule, not a showroom

A local focus. We work from Oakleigh across the neighbouring south-east suburbs: Oakleigh South, Oakleigh East, Huntingdale, Hughesdale, Murrumbeena, Carnegie, Clayton and Chadstone. Our planning is built around the post-war brick homes, older units and townhouses common to the area, with their tight footprints and ageing plumbing.

A written schedule and an itemised quote. Most renovation problems come from decisions made in the wrong order, like a vanity chosen before the plumbing is set or a tile chosen before the falls are worked out. So we write the room down first: layout, waterproofing system, wall and floor finishes, fixtures and fit-off, in the order they are built. Each line becomes a line of your itemised quote, and you know which stage comes next throughout the work.

Handover checked against the schedule. At the end we walk through the finished room against that same schedule, item by item, and pass on the care details for what was installed. It works the same for a small bathroom in an Oakleigh unit, an ensuite off a main bedroom or a complete bathroom renovation in a family home in Carnegie or Clayton.

01–04

The schedule: before a tile is laid

01 · Consultation

We look at the room, the plumbing and how the space is used day to day. You leave with a clear idea of what is possible and what the brief should include.

02 · Design & layout

Fixture positions, storage and finishes are drawn up and selected together. See Bathroom Design for how layouts are planned.

03 · Written quote

The schedule becomes an itemised quote, so every line of work has a matching line of cost. Nothing on the list is left to be decided later on site.

04 · Strip-out

The old bathroom is removed down to the substrate and the room is checked before rebuilding. Anything hidden behind old tiles is dealt with now, not after.

05–08

The schedule: building the room

05 · Waterproofing

Membranes, corners and junctions are prepared and applied before any tile goes down. It is the stage you never see and the one that matters most; read more on Bathroom Waterproofing.

06 · Tiling

Set-out, falls to the waste and grout lines follow the schedule. Format and finish options are covered under Bathroom Tiling.

07 · Fit-off

Vanity, tapware, screens, mirrors and accessories are installed and sealed. See Vanity Installation for joinery choices.

08 · Handover

We walk through the finished room against the original schedule. You get the product and care details for what was installed.

Large luxurious bathroom featuring patterned wall tiles, twin dark vanities, a spa bathtub, glass shower and warm geometric pendant lighting.

PLATE 02 — FINISHED BATHROOM INTERIOR · DESIGN INSPIRATION

The service index

Twelve services, each with its own page covering options, process and common questions.

Complete Bathroom Renovations — strip-out to handover

Ensuite Renovations — compact rooms off the bedroom

Small Bathroom Renovations — more from a tight footprint

Luxury Bathrooms — stone, freestanding baths, detail

Bathroom Design — layout and selections first

Bathroom Tiling — set-out, falls and grout

Bathroom Waterproofing — membranes and junctions

Shower Renovations — bases, niches, screens

Walk-In Showers — step-free, linear drains

Vanity Installation — wall-hung or floor-standing

Laundry Renovations — joinery and appliance space

Leaking Shower Repairs — diagnose, reseal or rebuild

Spacious bathroom with a freestanding white bathtub beside a large window, glass shower, timber vanity, stone-look surfaces and forest views.

PLATE 03 — BATHROOM WITH WINDOW LIGHT · DESIGN INSPIRATION

Before & After Transformations

As genuine projects are added, each project record will pair the room as it was with the room as it was handed over, taken from the same position, alongside the suburb, bathroom type, brief, solution, materials and final result.

Only genuine photographs of our own work will appear in those pairs. The image here is inspiration for the finish, not a completed job.

Oakleigh & South-East Melbourne

SERVICE AREA

Oakleigh · Oakleigh South · Oakleigh East · Huntingdale · Hughesdale · Murrumbeena · Carnegie · Clayton · Chadstone

Oakleigh is home base. Post-war brick homes, older units and newer townhouses across these neighbouring suburbs share the same questions: tight footprints, ageing plumbing and showers that have started to leak. If you are nearby and unsure whether we cover your street, mention your suburb in the quote request.

Frequently Asked Questions

Short answers to the questions most renovations start with. For more, see the full FAQ page.

Is the waterproofing redone in a renovation?

In a complete renovation the room is stripped back and new waterproofing is part of the written schedule, applied before any tile goes down. Where only a shower is leaking, the scope depends on what is found. See Bathroom Waterproofing and Leaking Shower Repairs.

Can a small bathroom have a walk-in shower?

Often, depending on the floor, the drain position and the layout of the room. It is worked out at the design stage, before anything is ordered. See Walk-In Showers and Small Bathroom Renovations.

How is a quote prepared?

After looking at the room, we write up the layout, waterproofing, finishes and fixtures as a schedule, and each line of work is priced in an itemised quote. Start by requesting a free quote.

Which suburbs do you cover?

Oakleigh, Oakleigh South, Oakleigh East, Huntingdale, Hughesdale, Murrumbeena, Carnegie, Clayton and Chadstone. If you are nearby, mention your suburb when you get in touch. See Service Areas.

Bathroom Guides

Reading worth doing before you ask for a quote. Open a title for a short summary and a link to the full guide, or see all Bathroom Guides.

Bathroom Renovation Cost

What moves the cost of a Melbourne bathroom renovation, from layout changes to tile format, and how to scope a budget. Read the guide.

Small Bathroom Ideas

Space-saving layouts, wall-hung fixtures and tile choices for compact rooms. Read the guide, then see Small Bathroom Renovations.

Bathroom Waterproofing Explained

Why waterproofing fails and what careful work involves at corners, floor wastes and junctions. Read the guide, then see Bathroom Waterproofing or Leaking Shower Repairs.

Walk-In Shower Guide

Frameless screens, linear drains and step-free entries, and what each asks of the floor. Read the guide.

Renovation Checklist

The decisions, selections and approvals to settle before strip-out day. Read the checklist.

Start your schedule with a free quote

Describe the room in a few lines: your suburb, bathroom type, budget and timeframe. If photos would help, we can arrange them after we first get in touch.