Home  /  Renovation Services  /  Plastering and Painting

05 · PLASTERING AND PAINTING — MELBOURNE

Walls repaired first, painted second.

Repairing and refinishing interior walls and ceilings in existing Melbourne homes, from patching damaged or deteriorating plaster to preparing the surface properly and applying the final coats of paint.

ROOM

Interior walls and ceilings

CONSIDER

Patching cracks, holes and tired plaster · surface preparation · painting

DEPENDS ON

What is found behind the surface once work starts.

THE ORDER OF WORK

Most of a good finish happens before the paint.

Fresh paint over a cracked or poorly prepared wall usually shows every flaw within months. The work is done in a set order so each stage gives the next one something sound to sit on.

1

Look at the walls together

I visit, check the plaster by eye and by hand, and talk through which rooms, walls or ceilings you want refreshed and what you are hoping to achieve.

2

Repair damaged or deteriorating plaster

Cracks, holes, dents and loose or crumbling sections are cut back where needed, patched and built up so the repair sits flush with the surrounding wall.

3

Prepare the surface properly

Sanding, cleaning, filling small imperfections and priming repaired areas so the paint bonds evenly and patches don’t flash through the finish.

4

Paint

Ceilings, walls and trims are painted in the agreed finish, with furniture and floors protected and the room left tidy at the end.

DEPENDS ON

A small crack can be the visible end of a much larger problem.

Why the extent of repairs is confirmed on site

Plaster often looks sound until it is opened up. Old patches, moisture from a past leak or sheets that have come loose from the framing may only show once work starts. When that happens, I stop, show you what has been found and explain the options before anything extra goes ahead.

Scope, suitability, materials and estimated costs depend on the existing condition of your property and your requirements. A detailed written quotation normally follows an on-site assessment, and concealed conditions may require additional work.

If damage points to a plumbing leak or electrical fittings need to be moved, that work is done by appropriately licensed tradespeople, whom I can coordinate. See Coordinating Licensed Tradespeople, or read What’s Underneath Matters.

Close-up of a paint roller resting in a tray of white paint on a worktable, with painting supplies nearby.

A roller and tray of white paint ready for the final coats.

ON ITS OWN, OR AS PART OF A RENOVATION

A single room, or the last stage of a larger job

Some homeowners want a tired hallway or bedroom brought back into good condition. For others, plastering and painting is the stage that finishes a renovation once new fixtures are in and the walls around them have been made good.

It often goes alongside bathroom, kitchen and laundry renovations, tiling and flooring or general property maintenance and repairs. In every case you deal with me directly, from the first conversation to the final coat. I have approximately 15 years of hands-on residential renovation experience.

BEFORE YOU ENQUIRE

Three things that help me understand the job

— A few photos of the walls or ceilings, including close-ups of any cracks or damage.
— Which rooms are involved, and roughly how much is to be painted.
— Your suburb, so the site visit can be arranged.

The initial site visit and quotation are free. Here is how the site visit and written quotation work.