KITCHEN RENOVATIONS — MELBOURNE
Kitchen renovations for existing Melbourne homes, talked through directly with Ivan Bodnar, an independent renovation specialist with approximately 15 years of hands-on residential experience. Before anything is chosen, I look at how you use the room, what the existing walls, floor and services allow, and where the real decisions sit.
SCHEDULE · KITCHEN
A kitchen is mostly junctions: where the benchtop meets the splashback, where cabinetry meets the floor, where new finishes meet old walls. This schedule sets out the main entries I go through with clients at the site visit. It isn’t a menu with prices. It’s a way to see what each choice involves and what it depends on.
01 · BENCHTOP AND SPLASHBACK
CONSIDER
How the splashback finishes against the benchtop (tiles, sheet material or an upstand) and how that joint is sealed.
TRADE-OFF
Fewer joints are easier to wipe down. Tiles give more flexibility around windows, power points and uneven walls.
Depends on how straight and sound the existing wall is.
02 · SURFACES
CONSIDER
Benchtop, cabinet and floor finishes chosen for how the kitchen is actually used every day.
TRADE-OFF
Some surfaces look sharp but show wear, heat marks or water staining sooner. Others last longer but are harder to cut and fit.
Depends on your budget, the cabinetry and what sits underneath.
03 · PRACTICAL LAYOUT
CONSIDER
Bench space beside the cooktop and sink, drawers versus doors, and clear walkways between them.
TRADE-OFF
Moving the sink, cooktop or dishwasher can improve how the kitchen works, but it usually means relocating services.
Depends on where plumbing, power and gas currently run.
04 · STRUCTURE AND SERVICES
CONSIDER
The condition of the walls and floor, and what’s behind and beneath the old cabinetry.
TRADE-OFF
Keeping the current footprint is usually simpler. Changing it can open up the room, but it also exposes more.
Depends on what’s found once the old kitchen comes out.
A kitchen mid-renovation, with cabinetry and surfaces protected while work continues.
COORDINATED BY IVAN · CARRIED OUT BY LICENSED TRADES
Most kitchen renovations involve some regulated work. I don’t personally carry out plumbing, electrical or gas work that requires a specialist licence. When your renovation needs it, for example relocating a sink, adding power points or connecting a cooktop, appropriately licensed tradespeople do the work, and I coordinate them as part of the project. You still deal with one person for the renovation itself.
Reference photo: a bright kitchen with white cabinetry, a green splashback and a patterned island panel.
SURFACES AND PRACTICAL LAYOUT
A clean splashback line or a level benchtop depends on what happens first: protecting what stays, removing what goes, and checking the walls and floor before new cabinetry is fitted. Once the plan is agreed, the work follows that order.
BEFORE YOU ENQUIRE
Scope, suitability, materials and estimated costs depend on the existing property conditions and your individual requirements. A detailed written quotation normally follows an on-site assessment, and concealed conditions found once old cabinetry, splashbacks or flooring are removed may require additional work.
A useful first message
— A few lines on what isn’t working in the kitchen now
— Some photos of the benchtops, splashback and floor
— Your suburb
An initial site visit and quotation are free. That visit is where the schedule above gets filled in for your kitchen.
RELATED READING