RENOVATION GUIDE · QUOTATIONS EXPLAINED — MELBOURNE
A renovation price written without seeing the room is a guess. This guide explains why I prepare a detailed written quotation after an on-site assessment, what shapes the scope, materials and estimated costs, and how concealed conditions are handled if they appear once work begins.
IN THIS GUIDE
i. WHY THE VISIT COMES FIRST
Depends on: the existing conditions and what you need from the room.
One bathroom may have sound walls and a level floor. Another of the same size may have loose sheeting, an uneven substrate or old fixtures that change what can safely sit on top. Photos and a short description help me understand your project, but they can’t show me what the walls and floor are really like.
That’s why the initial site visit and assessment are free. I look at the room, talk through what you have in mind, explain the options honestly and then prepare a detailed written quotation based on what’s actually there, not on an assumption made over the phone.
You can read how the whole process runs on Site Visit and Written Quotation.
ii. ROOM AS IT STANDS
The condition of walls, floors and substrates, the existing layout, access to the room, and what has to be removed before any new work can start.
WHAT YOU NEED
How you use the space, the finishes and fittings you’re considering, and which options suit the room. Material choices on their own can change the scope considerably.
DEPENDS ON OTHERS
I don’t personally carry out regulated plumbing, electrical or gas work. Where a renovation needs it, I coordinate appropriately licensed tradespeople and explain how that work fits into the project. More on Coordinating Licensed Tradespeople.
Reference photo: wall tiles being set over adhesive, the visible layer that every quotation assumption sits beneath.
Reference photo: a tile sample. A different choice later can change the figure.
iii. READING IT LINE BY LINE
Scope. What’s included, task by task. If something you expected isn’t listed, ask before work starts.
Materials. Which materials and finishes the estimate is based on. Choosing a different tile or fitting later may change the cost.
Assumptions. What the quotation assumes about conditions that can’t be fully seen until old surfaces come off.
Licensed work. Which parts involve licensed tradespeople I coordinate, rather than work I do myself.
Timing. A realistic indication rather than a fixed promise. Timeframes depend on what’s found and the work involved.
iv. CONCEALED CONDITIONS
Some problems only show once old tiles, sheeting or flooring are removed: a deteriorated substrate, moisture damage, or an uneven base that couldn’t be seen during the assessment. Concealed conditions like these may require additional work.
If that happens, I’ll show you what’s been found and explain the options and their cost, so you can decide how to go ahead. It’s better to know about it now than to tile over it.
A realistic quotation names what it can’t yet see.
Why the condition underneath shapes the plan: What’s Underneath Matters.