Home  /  Renovation Services  /  Bathroom Renovations

01 · BATHROOM RENOVATIONS — MELBOURNE

Bathroom renovations, assessed before the tiles are chosen.

It starts with a free site visit. Ivan looks at the walls, floor and plumbing points you have now, then talks the options through with you plainly.

Finished modern bathroom with a glass walk-in shower, white tiled walls, freestanding bathtub, vanity, toilet and large wood-framed mirror.

Reference photo: shower, vanity and tiling are each listed separately in the schedule below.

BEFORE ANYTHING IS CHOSEN

A good bathroom starts with a practical look at the room you already have. Before you pick a tile or a vanity, I work through these points with you on site:

  • What condition the walls, floor and substrate are in behind the current finishes
  • How the room is used day to day, and by whom
  • Where the plumbing points are now, and whether moving them is worth the extra work
  • Which surfaces, fixtures and storage suit the room and your budget
  • What licensed plumbing or electrical work the scope will need

HOW TO READ THIS

Each column below is one step in a decision. Scope, suitability, materials and estimated costs depend on the existing property conditions and on what you need from the room. Everything is confirmed after a site visit.

A bathroom, line by line.

Bathroom renovations are the main focus of my work across Melbourne and the surrounding suburbs. As an independent renovation specialist, I assess the property myself, explain the options plainly and manage the work personally from the first consultation.

CONSIDER

Layout, surfaces, fixtures, storage

Layout: whether the shower, vanity and toilet stay where they are or move.

Surfaces: wall and floor tiles, grout colour and how much of the room is tiled.

Fixtures: bath or walk-in shower, vanity size, tapware.

Storage: recessed niches, vanity drawers, mirrored cabinets.

TRADE-OFF

What each choice asks of the room

Keeping the existing layout usually means less disruption to plumbing. Moving fixtures can make the room work better, but it needs licensed work.

Large-format tiles mean fewer grout lines, but they need flatter walls and floors. A niche gives you storage, but only where the wall framing allows it.

DEPENDS ON

Walls, floor and substrate

Whether the wall sheeting is sound, how level the floor is, and what turns up once the old finishes come off.

These conditions decide which options are realistic, so I talk them through with you before any finishes are chosen.

WHAT’S UNDERNEATH MATTERS

New tiles look only as good as the surface they sit on.

A common renovation mistake is focusing on how the room will look without paying enough attention to what is underneath. Worn sheeting, uneven floors and hidden damage can all affect how long the new finishes last.

That is why the assessment comes first. If concealed conditions show up once work starts, I explain what has been found and what the options are before going further.

Read: What’s Underneath Matters

Interior demolition site with exposed structural supports, stripped walls, rubble, tools and partially removed finishes.

Stripped walls and partly removed finishes during an interior renovation.

08 · COORDINATING LICENSED TRADESPEOPLE

Licensed work, properly coordinated

I don’t personally carry out regulated plumbing, electrical or gas work. When a bathroom renovation needs it, such as relocating drainage, new tapware connections, lighting or exhaust fans, that work is done by appropriately licensed tradespeople, and I coordinate them as part of the project.

This service covers renovations of existing homes. New home construction and 24-hour emergency call-outs are not offered.

How licensed trades are coordinated

SITE VISIT AND WRITTEN QUOTATION

From first message to agreed scope

1

Describe the bathroom

Send a text or enquiry with a few photos of the room and the property’s suburb.

2

Free site visit

I assess the room in person, check the visible conditions and talk through the options with you.

3

Written quotation

A detailed written quotation normally follows the on-site assessment and sets out the proposed scope.

4

Concealed conditions

Some problems only show once the old finishes are removed, and they may need extra work. If that happens, it is discussed with you first.

Talk your bathroom through before anything is chosen.

You’ll deal directly with Ivan Bodnar, an independent renovation specialist with approximately 15 years of hands-on experience in residential renovations. Send a few photos and your suburb through the enquiry page, or call 0413 142 055.